So based on that math around 49 Z06's were built today with mine being #66 means mine should be built around 9am tomorrow and being a Vet on Veterans day how cool!. :D

One thought as to why they are not installing the spoilers is the shipping cover. These spoilers are pretty tall and the cover would not fit as well and maybe flap in the wind a little which could cause some paint rubbing.
 

· Registered
Joined
·
1,922 Posts
John told me his car will start down the line tomorrow but won't hit the finish line until sometime early Friday morning.

If you can see a door open can you verify the door sills just say Corvette on them? I believe that is what I could see from the pictures.
 

· Registered
Joined
·
1,922 Posts
152 at 2P. So, elegant may not see his car come off the line tomorrow? Guessing my SG 1LZ should be coming off soon after his car based on the timing of prior events.

All good things come in good time...

Also...2 days production time...does that include frame construction?

With cold weather headed east, will they be able to move cars outside if temps are 20 degrees or less? Won't the tires crack?
Looking at BG weather it doesn't look like it will get down to 20 looks like the coldest it will hit is 23 Friday night but they won't be moving cars at night. During the day the temps are above freezing.
 