While no dates have yet been announced, we have learned the order of producing the different Z06 models.

First, the Z06 coupes with manual transmissions will be produced.

Second, the Z06 coupes with the 8-speed automatic transmission will be introduced into the production line. Automatic transmission coupes could be no more than one week behind the manuals -- or perhaps a longer introduction delay for the auto-trans Z06's than that. We just do not know.

Third, probably around late winter, the Z06 convertibles with manual transmissions will start down the line, followed again by automatic transmission convertibles.

The timing delay for the Z06 auto-trans coupes, that is the interval between the Z06 coupe manual and the Z06 coupe auto-trans cars, will help give us a clue how much later the last group, the Z06 auto-trans convertibles will follow the Z06 manual trans convertibles.
 

·
Registered
Joined
·
522 Posts
So are the Z06s being built in a single period run then or is it possible there may be two or more runs at different points? Will Canadian Z06s be completed together as they have identical variances? From what you write it might seem like all Z06s would be out long before May.
 

·
Registered
Joined
·
10,424 Posts
That is awesome information, John! Thank you for gathering and disseminating all this information for us!
 
  • Like
Reactions: ALF01 and Z06 Owned

·
Senior Member
Joined
·
18,670 Posts
Discussion Starter #5
So are the Z06s being built in a single period run then or is it possible there may be two or more runs at different points? Will Canadian Z06s be completed together as they have identical variances? From what you write it might seem like all Z06s would be out long before May.
1) Once started, Z06's will be totally integrated into the existing assembly line, intermixed along with StingRay coupes and convertibles -- just as "captured test fleet" Z06's were intermingled with StingRays two days ago. BGAP will probably start building customer cars in late October or early November (but this time frame is not confirmed), and we are still hearing first customer deliveries in late December.
2) The last 2015 Z06 will probably go down the assembly line the last scheduled day of 2015 production, e.g. June 26th.

We still have no confirmation as to the total number of Z06's to be built, though no reason now to question most earlier estimates of about 4,000 2015's being built.
 